Monday, December 29, 2014

Deep - tine aeration on tees

We are now deep-tine aerating tees. We expect to finish Tuesday afternoon.

Friday, December 19, 2014

Winter Cup placements

In order to protect the main pin placements we push the cups toward the edges.

Wednesday, December 10, 2014

The new concrete wash pad

The hydrants and plants will complete the wash pad which will be operational for the 2015 season.

Deep - tine aeration on fairways

Fairways are deep-tine aerified two times using two different machines.

Friday, December 5, 2014

Friday, November 14, 2014

9 tee bed

Rafael and Chrispin are planting some ornamental grasses at the intersection of 9 & 11 tees. More plants will be added next spring.

Tuesday, November 11, 2014

Work on 14 bunker

We are recontouring the bunker on hole #14 due to an irrigation leak that left the pipe too close to the bunker edge.

Monday, November 10, 2014

Sod work on bunkers

Bunkers are being prepared for new sod later this week.

New bed

A new bed is being prepared near 9 & 11 tees. The bed will  include some tall ornamental grass in order to screen the 11th tee and break up the view of the asphalt.

Wednesday, November 5, 2014

Wash pad relocation

More progress has been made on the new equipment wash pad. Here the rain garden is formed and the pad is graded and stone applied.

Monday, October 27, 2014

Monday, October 13, 2014

Monday, October 6, 2014

Greens aeration started today.

Greens 1-7 will be completed today. We plan to do holes 11-16 tomorrow. The remaining holes may be done next Monday and Tuesday.

Friday, September 19, 2014

Hard fescue areas

Jose Luis is hand watering areas of neww seedlings in the hard fescue. These areas should be full next season.

New flower bed

We are adding a flower bed, (using existing plants from the course) above the pool area to soften the fence.

Monday, September 15, 2014

Putting green nursery.

The crew is preparing a portion of the bentgrass nursery for seed. This nursery is used to repair any damage on greens, tees or fairways.

Saturday, September 6, 2014

Monday, August 25, 2014

Wednesday, August 6, 2014

Stream cooridor enhancements

Sam, Emiliano and Bernardo are enhancing the riparian buffer along the stream on hole #14 with native perennials that will also be an excellent food source for Monarch butterflies and honey bees.

Monday, August 4, 2014

Deep tine aerating greens this week

We will be aerating greens with solid tines this week. Once aerified the green will be rolled and put back into play.

Friday, July 25, 2014

Scouting for weevils

Rafael is scouting for annual bluegrass weevil, a small insect that can cause big problems.

Green speed

Green speeds have been fluctuating through the month of July. We are aware of the issue and working to return to more consistent speeds within the next few weeks.

Wednesday, July 9, 2014

Wind damage

Last night's wind blew down this Linden tree along 12 fairway.

Tuesday, June 24, 2014

Deep - tine aeration on greens.

Jesus and Jose deep-tinning greens on Monday and Tuesday of this week. Greens were rolled and open for play immediatly followong.

Tuesday, May 27, 2014

Controlling Kulinga grass in fairways.

The Kulinga grass is turning brown and will require two treatments to control.

Monday, May 19, 2014

Tuesday, May 13, 2014

Drainage work

The crew working on drainage repairs in the rough btween 8 and 17. We plan to work on 8 fairway tomorrow.

Friday, May 9, 2014

Rough enhancements

Our efforts to improve the rough around the fairways are very evident this time of year.
Seed is germinating and we are expecting good results.

Thursday, May 8, 2014

Tree work

Arader Tree Service is cleaning the broken stubs off damaged trees and taking down any hanging branches.
Tree removals will be addressed over the winter.

Thursday, May 1, 2014

5.5" of rain fell yesterday and last night.

The water level was above the bridges. As of Thursday morning things were looking pretty good.
The course will be closed for most if not the whole day.

Wednesday, April 30, 2014

Heavy rain forecasted.

The course will be closed all day and probably into tomorrow.

Wednesday, April 23, 2014

rough aeration and overseeding

The rough has been seeding 20" out from the fairways. In order to help the new seelings mature please keep carts in the fairways for the month of May.

Tuesday, April 8, 2014

Greenbank aeration

In addition to aeration, the greenbanks will be overseeded with perennail ryegrass.

Paver instalation at tennis courts

Jesus and his crew work to complete pavers at the tennis courts prior to court resurfacing.

Thursday, April 3, 2014

Bunker work

The crew working the edges of 18 bunker. Additional sand will be added next week.

Re distributing sand

Rafael and Gilberto moving sand where it is needed.

Sunday, March 23, 2014

# 6 green drainage completed.

The XGD crew doing the final cleanup. The green should be open for play by the weekend (weather permitting).

Saturday, March 22, 2014

Lateral drain lines being installed.

Drainage on 6 green

The XGD crew starting installing drainage on the 6th green today. Work should be completed by Sunday afternoon.